Technical Ditch Illustration/Cartographic Design

  • terminés - Sélection en attente

Brief de Design Graphique

I'm going to add some more information here, as the designs received so far, while appreciated, haven't quite captured what I'm looking for - my fault not theirs. You can see different PDF's of about the same area. There is one with lots of extra red lines running everywhere. That PDF is the Clark County Stormwater system - on paper! The problem is, their system in reality was a fraud. What we're trying to do is to create a visual image to demonstrate how the system really operates. The two red lines on their website, that run parallel north and south are actually supposed to be ditches. These two ditches are on either side of a railroad track. The water is flooding the area including running over the top of the railroad tracks. You can also see where my employee Nate added different water discharges into the west ditch. Those should be noted and labeled on your proposal. All of this water goes into the west ditch and flows north, until the magic culvert takes the water underground to the east ditch. The west ditch then stops shortly north of the magic culvert, it doesn't really exist. There is no east ditch to the south of the magic culvert, it does not really exist. After the magic culvert, the water then flows north in the eastern ditch. The reason we call it the magic culvert is this single 24 inch culvert was supposed to handle all this water from all these upstream sources. Upstream again is south and the water flows north. So I would like the final presentation to reflect the red lines not really existing - as they don't in reality - and be shown as I described above. Then of course the water arrows should flow over the top of the ground as I depicted
Project Goal: Create a single-page professional diagram overlaid on the provided map ("Blank Barberton Map.pdf") to illustrate water flow issues and railroad infrastructure. Use original source from Clark County Website

Deliverable Formats:

High-Resolution PDF (for printing and emailing).

PNG or JPG Image (so I can easily paste it into a PowerPoint presentation).

Visual Requirements (What to Draw):

Background: Use the provided "Blank Barberton Map" as the base layer.

The "Magic Culvert": Mark a specific point on the railroad curve and label it "Magic Culvert."

West Side (Left of Tracks):

Draw broad blue arrows showing water flowing across the property from West to East toward the railroad tracks.

Draw a solid blue line parallel to the tracks on the West side, located only to the North of the Magic Culvert. Label this: "Short section of West ditch."

Crossing the Tracks:

Draw arrows showing water over-topping (flowing over) the railroad tracks at multiple locations along the curve.

Draw a flow arrow going through the Magic Culvert to the East side.

East Side (Right of Tracks):

Show water exiting the culvert and fanning out in multiple directions.

Draw a dashed/broken blue line running South from the culvert. Label this: "Poorly maintained East ditch."

Critical Detail: Do NOT draw a ditch on the East side South of the immediate culvert area. (Annotation: "No East ditch South of this point").

Style: Clean, professional, and easy to read. Use blue for all water/ditch indicators.


Aspect

Chaque curseur illustre les caractéristiques de la marque client et le style que doit transmettre votre design de logo.

Élégant
Audacieux
Léger
Sérieux
Traditionnel
Moderne
Sympathique
Professionnelle
Féminin
Masculin
Coloré
Conservateur
Économique
Haut de gamme

Exigences
Bien d'avoir
  • For those of you who submitted really quickly, thank you, but apparently one PDF didn't load. The upstream culverts feeding the west ditch need to be added and labeled

Fichiers
Télécharger tous les fichiers - 2,5 MB
PDF
Blank Barberton with old ditches_0001
mardi 9 décembre 2025
PDF
2021 County Stormwater Flow_001234
mardi 9 décembre 2025
PDF
Blank Barberton Map
mardi 9 décembre 2025
PDF
County Ditch Map
mercredi 10 décembre 2025
PDF
Nate Barberton Culvert Locations
mercredi 10 décembre 2025
Paiements
1e place
US$150
Primes de participation x 4
US$10
Total
US$190

Date limite du projet
16 déc. 2025 19:54:04 UTC
Language

Inspiration pour Design Graphique
Bid on my graphic design, Online typography design creator, Newspaper ad creator, Cheap graphic design, Newspaper ad maker, Work from home design, Graphic design clipart creator, 3d dog graphic creator, Graphic design tender online, Bike graphic design software